Part 1- Started December 2012


Our goal is to remodel our master room. We will be making two small rooms into one big room and putting a door in the bathroom for the master bedroom. also putting in a corner bath tub and a walk in shower, because, of the lack of room we will be putting the bath tub in the bedroom. ( I know... sounds weird right?) But it will be pretty cool when its all finished.. Our First step was removing the sheet rock and throwing it out... That took a lot of trash loads. 




The second step was demolishing the framing between the two room and the walls against the old bath tub because the wood was deteriorating (The nice thing is we still used the old wood that was still in good shape for framing walls in the barn and the pond. 





Here's some pluming that we could not do... This is part of the shower floor after the pluming was finished and the shower pluming shower heads which are on both sides... :)





The same contractor that did the pluming also re-framed the closets that were reposition to the sides of where our bed will be; which are, on both corners of the room. When you walk into the room they're on the farthest left and right corner. He also left room on the sides for me to build built in book shelves. My dad also installed all the new wiring for the receptacles and fans and dimming lights above the bed and the sides of the room. Thank you so much dad!!! Justin and I also put it the sheet rock and the closet shelves and Bar. Things are getting closer!!!



This is where our Corner tub is now after the framing and pluming was finished and the unfinished side is where the bathroom is and door etc. I also started putting in the cement floor for the tiling area and started tiling the closets. Getting closer... :) 